How Sherwin-Williams Helped Rudco Improve Performance and Profitability
Quality Issues Slowing Growth
Rudco, a New Jersey-based manufacturer of waste handling equipment, depends on coatings that do more than protect – they represent their customers’ brands in the field.
But inconsistent performance was slowing them down, creating rework, delaying production and limiting their ability to scale.
Challenges included:
- Inconsistent coating quality
- Long dry and recoat times (24-48 hours) delaying shipment
- Frequent defects including drips, runs, pinholing and dry spray
- High rework rates, with up to 10-20% of certain colors needing correction
- Limited production capacity, restricting growth
What makes Sherwin different is, it’s a very large company that has the means to react and produce… but they also make you feel important no matter what size your organization is.
Simpler Application, Smarter Chemistry
Sherwin-Williams took a discovery-led approach, working to understand Rudco’s processes, challenges and goals before delivering a tailored solution.
What changed:
- Introduced a more user-friendly alkyd coating optimized for application consistency
- Streamlined custom color lead times to 1-2 days with FastTrack
- Provided hands-on training to standardize application processes
- Delivered ongoing technical support to ensure long-term success
Faster Throughput, & Higher Confidence
The impact was immediate – and measurable.
- Recoat time reduced by up to 90% (from 24-48 hours to ~4 hours)
- Next-day shipping enabled with overnight dry times
- Production increased ~33% (from ~30 to 40 units per week)
- Rework reduced by up to 50%, with defects nearly eliminated
- $190,000 in annual cost savings from reduced downtime and rework
- 2+ days saved in pack-and ship timelines
- Faster custom job turnaround, unlocking new revenue opportunities
Let's Connect
Get in touch with your local Sherwin-Williams representative to learn how Sherwin-Williams can be your competitive edge.
Contact Us