How to Prevent Moisture Problems on Concrete Flooring

Focusing on the three key areas to prevent moisture and disbondment problems: sub-grade preparation, concrete specification, and surface preparation

Learn More or Get a Free Flooring Evaluation

moisture bubble or blister on a resinous floor

From the Ground Up: Preventing Concrete Floor Blisters and Disbonding Problems

Applying a finish to a concrete floor using epoxy, urethane or other polymeric materials provides both durability and enhanced aesthetics. On rare occasions, an installation may experience disbondment. This unexpected development presents problems to owners, contractors, specifiers and material manufacturers alike. The three key areas to focus to prevent disbondment problems are: sub-grade preparation, concrete specification, and surface preparation.

Landscape and Sub-Grade Preparation for Concrete Slab

The landscape around the building should allow for proper drainage away from the slab. Below grade concrete must be waterproofed on the exterior using urethane coatings to prevent water from accessing the slab or area beneath the slab. Grades should provide natural flow away from the building and roof drainage must be directed away from the building.

Vapor Barrier for Concrete Slab 

The concrete slab sub-grade must be designed to prevent water from accessing the slab. This requires the use of four inches of coarse aggregate to break the capillary flow of water. Two inches of coarse sand is placed over this to fill surface voids and allow for the application of the vapor barrier. The vapor barrier must meet ASTM E 154-88/93 having a minimum perm rating of less than 0.09, as represented by 10-mil polyethylene. Placement of this moisture barrier must be continuous and in compliance with ACI 504. ACI 302 recommends a two-inch layer of dry sand above the vapor barrier. If following this recommend practice, extraordinary measures must be taken to keep this sand dry. If water is allowed to be captured within this sand layer, it will serve as a water reservoir under the slab. In some cases, it may be more advantageous to pour the concrete directly onto the moisture vapor barrier. Wet curing the concrete will prevent slab curl and corner cracks.

Concrete Formulation for Concrete Slab (1)

The concrete itself must below permeability and high density to minimize moisture movement within the slab. The following guidelines will yield a suitable concrete mixture:

Installing a concrete mix which meets the above criteria will not only prevent problems associated with high porosity concrete but will minimize the risk of Alkali-Silica Reaction (ASR). ASR requires reactive forms of silica or silicate in the aggregates, sufficient alkali (sodium and potassium) from cement, and sufficient moisture in the concrete. The reaction of the alkali fluids in the pores with the silica rich aggregate results in the formation of a swelling gel. The resulting pressure will eventually lead to cracks in the concrete.

The concrete should be finished with a light steel trowel. Over finishing the concrete will only bring additional past to the surface, which does not offer a strong, bonding surface. Best results are obtained when the concrete is wet cured for three days using ponding or wet burlap. The concrete must cure for a minimum of 28 days prior to the application of epoxy or urethane flooring systems. This arbitrary length of time has been adopted by most floor finish manufactures based upon laboratory studies indicating that 95% of the excess water will have left the slab by this time. If the environmental conditions are cooler and/or more humid than typical laboratory conditions, this period of time will be longer. Using a calcium chloride test kit (ASTM E-1869) to measure the moisture drive prior to proceeding will help determine the readiness of the slab for coating (Product No. AI 15).

Concrete Slab Surface Preparation (2)

After any decontamination of existing concrete, surface preparation is the same for new construction or existing slabs. Mechanical pulverization using shot blasting is by far the best technique. Acid etching introduces excess water and leaves a salt residue and is not recommended as a preparation technique. The surface profile for coatings, slurries and broadcast systems should be not less than 20% of the thickness of the system. For trowel-applied systems, the surface profile should be not less than 10 mils. For more detailed information refer to ICRI's recent publication on standardized surface preparation. (3)

After shotblasting, inspect the concrete for surface irregularities in need of repair. Use polymer modified concrete (Product No TPM 721) or epoxy fill materials for repair areas. Cracks should be treated with EPO-FLEX (Product No. 3552) and reinforced with six-inch fiberglass cloth (Product No. FT6-50).

The reading obtained from the Calcium Chloride test must be less than or equal to three pounds per 1000 square feet per day at use conditions. Both temperature and humidity will affect this reading. Moisture will migrate through concrete from warm damp conditions to cool dry conditions. The relationship between temperature and humidity is called vapor pressure. Moisture will move from high vapor pressure to low vapor pressure. If the MVT reading is higher than 3#/100sf/24hr, remedial measures must be taken. Raising the temperature of the room and increasing the ventilation prior to placing the flooring material will help remove the excess moisture from the slab. If time is not an option, apply P-105 to help neutralize excess ions and Recover 9000 to increase the density and decrease the porosity of the upper slab surface.

Concrete Slab Priming

Using a good penetrating primer will also help to eliminate disbonding problems. This primer serves to repair some of the micro fracturing of the slab due to the shot blasting. Most primers work through mechanically bonding. They penetrate the pores as a liquid then polymerize as a lock and key model. Some contractors continue to "scrub-in" the primer to assist in the penetration process. In special cases, it may be necessary to work with a pre-primer (Product No. 5531) that actually bond to the substrate when surface bonding is in question.

Following these steps will minimize, if not eliminate, problems associated with disbonding of the flooring system from the slab. In new construction, sub-grade detail and landscape design remove potential sources of water. Placing a dense, non-porous slab with proper curing will minimize moisture vapor movement. And proper surface preparation and priming will provide an excellent bond.

1) Guide Specification Cast in Place Concrete for Floor Slabs on Grade that Will Receive Semi-Permeable or Impermeable Finishes (General Polymers Guideline Specification).

2) Guideline Instructions for Concrete Surface Preparation (Form G-1).

3) Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays, Technical Guideline No. 03732.

Prevent moisture problems & concrete blisters with flooring from Sherwin-Williams!

At Sherwin-Williams, our mission is to provide you with flawless flooring solutions that meet the needs of your facility. Our team of experts understands the importance of proper sub-grade preparation, concrete specification, and surface preparation and their role in preventing concrete blistering. Contact a Sherwin-Williams representative today to learn more about our methods of preventing concrete flooring moisture problems.


Color Resources

Discover flooring palettes, aggregate designs and color trends.

LEARN MORE

System Lookup

Find out more about our innovative floor systems for a variety of industries.

FIND A SYSTEM

Let's Talk

We'd love to discuss your needs for durable, resin flooring solutions.

CONTACT US
Back To Top