New Office Development Protected by FIRETEX® System

The impressive office development at 20 Farringdon Street London, situated on a prominent position and located just minutes from the new Crossrail and Thameslink and three London Underground stations, offers 8,000 sqm of Grade A accommodation over 11 column-free floors.

Commercial building under construction

Working with the fabricator, Bourne Steel, structural engineering specialists, Watermans, and the main contractor, HB Reavis, fire protection experts from Sherwin-Williams assisted with all stages of the project and developed the specification needed to protect the 1,000 tonnes of steelwork. The building was required to be protected against corrosion for 20 years in C1-C3 environments, and have between 90 and 120 minutes passive fire protection.

The solution for this involved FIRETEX FX6000 intumescent coating applied directly to the steelwork blasted to Sa2 1/2 standard, and top coated with Acrolon C137V2.  This Certifire approved system can provide up to 120 hours protection against fire and is suitable for external environments up to C5 when tested under ETAG 18 Part2. The Acrolon acrylic urethane topcoat has excellent exterior gloss and colour retention, which will give the desired long term aesthetic finish to the exterior of the building.

Outcome

The recommended system should provide the desired durability and protection against both corrosion and fire as specified by the client, whilst keeping the building looking pristine.

 


Technical Service

We're here to ensure your entire project is running smoothly and efficiently.

LEARN MORE

Product Lookup

Find out more about our innovative coatings for a variety of industries.

FIND A PRODUCT

Let's Talk

We'd love to discuss your needs for time-tested, smarter asset protection.

CONTACT US
Back To Top